FastLNG 1

The FastLNG 1 project represents an innovative approach to LNG production, combining modular design with existing offshore infrastructure to create a flexible and efficient liquefaction facility.

FastLNG 1
Sector
Energy
Developer
New Fortress Energy (NFE)
Location
Offshore Gulf of Mexico
Services

Summary

Omega Technical Services' involvement was crucial in ensuring the successful conversion and commissioning of the FastLNG 1 facility. Our comprehensive engineering support and commissioning services contributed significantly to New Fortress Energy's goal of creating a flexible, rapidly deployable LNG production solution. This project showcases our capability in supporting cutting-edge developments in the LNG industry, particularly in the realm of modular and offshore liquefaction technologies.

Key Feature

  • Conversion of a Jack-up Drilling Unit into a three-platform Liquefaction – Storage – Offloading facility

Project Scope

  • Development of a Fast LNG modular liquefaction facility
  • Capacity: 1.4 MM-metric ton (1.54-MM ton)

Modular Liquefaction Technology:

  • Utilizes latest advances in mid-size liquefaction technology
  • Designed for lower cost and faster deploymen

Repurposed Infrastructure:

  • Conversion of jackup rigs or similar floating infrastructure
  • Enables deployment in various locations with stranded natural gas resources

Storage Solution:

  • Permanently moored Floating Storage Unit (FSU) alongside the liquefaction infrastructure
  • Operates as an LNG storage facility

Key Advantages

  • Flexibility to deploy anywhere with large volumes of stranded natural gas
  • Faster deployment schedule compared to traditional LNG facilities
  • Cost-effective solution for monetizing stranded gas resources

Services Provided

Omega Technical Services provided crucial support to the FastLNG 1 project:

Marine Systems Engineering and Conversion Support:

  • Conducted detailed engineering for the conversion of the jack-up drilling unit
  • Designed integration systems for the three-platform configuration (Liquefaction, Storage, Offloading)
  • Provided technical support for marine systems adaptation to LNG production and handling
  • Ensured compliance with maritime regulations and LNG industry standards

Commissioning Planning:

  • Developed comprehensive commissioning strategies for the converted facility
  • Created detailed plans for integrating modular liquefaction units with the repurposed jack-up rig
  • Established timelines and milestones for the commissioning process
  • Designed safety protocols specific to the unique configuration of the FastLNG facility

Commissioning Execution:

  • Oversaw the implementation of commissioning plans
  • Coordinated between various teams to ensure smooth integration of all systems
  • Managed the testing and validation of newly installed liquefaction equipment
  • Supervised the startup procedures for the integrated Liquefaction-Storage-Offloading facility

Throughout these services, Omega Technical Services demonstrated:

  • Expertise in offshore facility conversion and LNG systems integration
  • Ability to manage complex, innovative projects combining multiple technologies
  • Commitment to safety and environmental standards in challenging offshore environments
  • Skill in optimizing commissioning processes for rapid deployment of LNG facilities