Project details
C2O Australia's involvement was crucial in ensuring the safe and efficient operation of the electrical systems supporting the Cross River Rail project's underground operations. Our comprehensive range of HV services contributed significantly to the project's progress, particularly in enabling the use of underground mining equipment. This project showcases our capability in providing specialized electrical services for major infrastructure developments, highlighting our expertise in both High Voltage systems and underground operations.Services Provided
Services provided
High Voltage Test Services:
- Conducted comprehensive testing of HV systems
- Ensured compliance with safety standards and operational requirements
High Voltage Electrical Installation:
- Installed HV substations and related equipment
- Implemented electrical systems to support underground mining operations
Cable Jointing:
- Performed specialized cable jointing for HV cables
- Ensured reliable connections in challenging underground environments
Cable IR & VLF Testing:
- Conducted Insulation Resistance (IR) testing on cables
- Performed Very Low Frequency (VLF) testing to assess cable integrit
- Identified potential weaknesses in the cable system before energization
Earth Testing:
- Carried out thorough earth testing for all electrical systems
- Ensured proper grounding to maintain safety and system integrity
Throughout these services, C2O Australia demonstrated:
- Expertise in complex High Voltage systems for large infrastructure projects
- Ability to work effectively in challenging underground environments
- Commitment to maintaining the highest safety standards in electrical installations
- Skill in integrating specialized electrical systems with mining equipment