Project Details
Omega Technical Services' involvement was crucial in ensuring the successful fabrication, installation, and commissioning of the Nasr Phase II Full Field Development Project. Our comprehensive range of services, spanning from the fabrication yard in South Korea to the offshore installation in the UAE, contributed significantly to the project's goal of increasing oil production capacity. This project showcases our capability in supporting large-scale oil and gas developments, particularly in the areas of complex offshore installations and international project coordination.
Key Features
- Increase oil production capacity from 22,000 bpd to 65,000 bpd
- Installation of a multi-platform super complex
- Subsea power and infield cable installations
Field Operator
Adma-Opco, a joint venture consisting of:
- Abu Dhabi National Oil Company (Adnoc) – 60%
- BP – 14.67%
- Total – 13.33%
- Japan Oil Development Company (Jodco, a subsidiary of Inpex Corporation) – 12%
Project Scope
- Production Capacity Increase:
- From 22,000 barrels per day (bpd) to 65,000 bpd
- Multi-Platform Super Complex Installation:
- Gas treatment platform
- Separation platform
- Accommodation platform
- Utilities
- Flares
- Interconnecting bridges
- Subsea Infrastructure:
- 44km subsea power cables
- 55km infield cables
- Integration:
- Connection to existing power generation facilities at Umm Shaif Super-Complex and Das Island
Project Timeline
- Expected completion: First half of 2019
Services Provided
Omega Technical Services provided crucial support to the Nasr Phase II Full Field Development Project:
- HHI Fabrication Yard Services (Ulsan, South Korea):
- Provision of commissioning supervision
- Supply of skilled commissioning technicians
- Oversight of equipment testing and pre-commissioning activities
- Quality assurance and control during the fabrication phase
- Offshore Services (Abu Dhabi, UAE):
- Provision of construction resources for offshore installation
- Supply of commissioning resources during the Hook-Up and Commissioning (HUC) phase
- Coordination of offshore activities with onshore support teams
- Implementation of safety protocols specific to offshore operations
Throughout these services, Omega Technical Services demonstrated:
- Expertise in both onshore fabrication and offshore installation phases
- Ability to manage complex, multi-location projects
- Commitment to safety and quality standards in challenging environments
- Skill in coordinating international teams across different project stage